Hey Kirt,
This rig is made of two 17 foot pieces of 8 inch carbon steel pipe with flanges welded on each end. The two sections are bolted together and there are blind flanges bolted to each end with penetrators for power/pressure/insturmentation. So you have two 17 foot long pieces about 300 lbs each. You would need to put it together at your site and re-insulate the outside of the pipes. The electric strip heaters inside worked last time I used it (about a year ago). You will to buy need a temp controller and a 220V relay (cheap on e-Bay). Sorry but I've got a busy schedule until September.

Kevin