After carefully removing the strong back and lowering the frames down onto the concrete floor
I got some friends around to help me move the port side of the main hull into the work area and
place it on top of the stbd side so I can prepare the two for joining.
Now I have them both in place my winching system should enable me to do all the rest myself.
A couple pics below. Note I only remove the peel ply when I have to. It doesn't look much but sure
keeps the surface beneath clean and free from contaminants.