Pete,
Here is a picture of mine. The sheet goes through the block at the end of the single line and then runs to two blocks at the base of the pelican striker, then back to the jib cleats. The 2 to 1 block with the twisted shackle goes to the clew.

Attached Files
jib.jpg (238 downloads)

Chris
Trident F16