I would use the largest diameter (3/16) monel or SS given that it is probably the highest loaded control line on the boat- maybe aside from maybe the forestay/mainsheet when sheeted in maximum. Even better to use backing plates on the rivets if you can get them up in there after taking off the foot of the mast.
Last edited by PTP; 07/11/08 02:04 PM.