Thanks for the advice. From what I've read the NA says the foam can be lifted slightly once the strips are glued to slide the bagging material under the foam between the foam and wooden mold stations. I've been a bit under the weather and have not replied sooner. I have a bum shoulder and I'm looking at going under the scope so it has slowed me down some. Take a look at my website to follow along with the construction method and progress www.themanshed.net then click on the TMS-20 link on the right.

Kevin I sent you an Email on yopur offer.


Mike Shappell
www.themanshed.com
TMS-20 Builder
G-Cat 5.7 - Current Boat
NACRA 5.2 - early 70's