Bolts and washer, or ow or three) pulled though on back "struts". Zern Rigging pulled through and made repairs to go sailing. Also Zern Rigging made the repalcement shroud in time for us to sail the next day as well. and Emerald Sails made the mainsail repairs at 4am to get the main up the next day as well.