Back to work on the A-Cat mast. In the first part I built the air pump system, and then tested it on the hull lay-up for the TMS-20, I did not want to just jump into the mast repair. In this post I am building the sleeves and showing how I bagged out the sleeves. I figure somebody may like to see a post on how to vacuum bag. On this project I had time to take some pics. One the TMS-20 lay-up we were too busy to grab the camera.
Mike Shappell www.themanshed.com TMS-20 Builder G-Cat 5.7 - Current Boat NACRA 5.2 - early 70's