Originally Posted by Cab
Paul,
Do you mind giving a few more details on how you get the lay up and bagging materials set up in the tube?
Thanks,


But thats the bit that kept me awake at nights trying to figure it out!

The trick was to wrap everything around a 2" mandrel [pipe] in reverse order [Starting with vac bag and ending with lay-up, poke it inside the 4" tube and then get it to stick/expand to fit. the 2" tube then is pulled out.

You can just see the 2" tube with the disposables already around it in the picture on the website.

I did it in about 3 hits because the pre-wetted carbon is very clingy and difficult to expand if too much is laid up at once.

This is a pretty half-arsed garden shed method and would never get used in any sort of production, but suits the one off approach.
Contrary to what others state, a large chunk of money was saved by doing this, that then went to pay for other parts of the build.

Paul f32#81