Tomorrow we would like to sail our spinnaker for the first time. We have figured out how to rig it for 80%, but have some doubts about the last part.
We have already managed to rig the sheets on the boat to the clew connection.
We've managed to rig the spi halyard and retrieverline (one peace of line from top of the spi to the pulley in the mast, down again, thrue a pulley on the beam, to the front, thrue a double pulley, to the back, thrue a clamcleat ( do not know if this is the right word), to the back of the trampoline, thrue a pulley, to the front, thrue the hole in the trampoline, rearside of the snufferbag, where it wil go thrue the patches, and connected to the last patch in the spi.
But we're not completely sure about the last part. Thats the separate line (halyard) which is connected to the other end of the double pulley (hanging loose halfway the spipole). We suppose one end goed to the tack corner of the sail? thrue the pulley on the end of the spipole? How to connect? Can anybody pleae give a short description?
Thanks a lot!