The main halyard should run trough the mast track. It should be no problem when the main and haylard are together in the mast track. Drill 2 holes at the bottom of the track, one 1 feet under the mast top the other 3 feets above the mast foot. Make sure that the holes follow the direction of the halyard.
Use a light micro block on top of the mast and a ring (aussi style) or a hook on your main that goes over the top of the mast.
The haylard and the block allone, won't hold the combined forces of the cunningham and main sheet.
good luck!
Andi