Reading the blurb on the Ansar site, it looks as though the Suunto B-95 uses the same principal and numbering as the Ansar 1.

But $220US seems a lot to pay for a modification, even after reading the description of what needs to be done.
I guess Swedish labour rates must be VERY high

I do like the way the Ansar system works though, it reads as though it would be easy and intuitive to use. Surely there must be someone else doing something similar?


John Alani
___________
Stealth F16s GBR527 and GBR538