It's amazing what can be done when you know what your doing.

In this case the lab techs. Thanks Neil & Paul.

1st photo, the join grinded back.
2md photo, 3 layers of 300g uni's and a 200g twill weave over the top with peel ply.
3rd photo, The section between the tape is the mast. To the right is a join and to the left is beefing up for the hounds.


Attached Files
Mast-repair 004.jpg (214 downloads)
Mast-repair 007.jpg (212 downloads)
Mast-repair 008.jpg (209 downloads)

Teach them how to think. Not what to think. Aus Blade 002