Run a bungee from one side of the from cross beam to the mast about 18-24 in up from the base to the other end of the front cross beam. Or from the mast, about 2 ft from the base to where the briddle connects to the forestay. The jib sheets go over this bungee.

The locations are approximate. experiment before you drill any holes. These are standard method used on many boats.