i start one one end,
Tie one end to the ring on the bridle then with other end tread the rope in this order....up thru the pully at top of mast...down the mast thru a rig or rope at spreaders (so the halyard dont get caught behind spreader)at the base of mast on the spin pole should be a pully and go forward to a double ended pully (for the tack line)back down the pole thru the cleat on main beam or on trap somewhere... crossing over the opposite side of center beam, thru a pully at the back of the center tube, under the tramp and up thru the chute which is between the dolphin striker and beam.
the halyard should be 20 meters. i went 21 to make sure.
the tack line goes from the pully at the end of the spin pole, thru the double ended pully which the halyard is thru and the end goes in a hole in the side of the pole with a knot tied behind it!
Matt