From a durability standpoint, I don't think its a big deal either way - at least with the C2 tramp construction.
In fact - as I think about it, there might be a problem with having the ratchet up on the boom. The first portion of sheeting out/in will result in the tramp flexing up/down before the line starts to feed through the ratchet block on the boom.