basically with the jib you should have a line running up from the jam cleat on the lower left side of the mast, up to the small block/pulley at the front of the mast just under the mast hound and then down to where the bow wires and forestay join together.

zip a few inches of the top of the jib to the forestay, then clip the nylon webbing loop to the stainless schafer? clip on the jib halyard.
pull on the jib halyard down about a foot to raise the jib and zip that foot, repeat...
when the jib is fully up attached the brass grommet to the the stainless twist shackle on the little stainless at the forestay chainplate adjuster.

then tension the jib halyard at the mast and lock it into the jam cleat. loop up the 20 odd feet of loose halyard and stuff it into the tramp tube sleeve. if no tramp tube sleeve there may be a mesh bag on the tramp to hold it.

there should be 2 harken ratcheting blocks, on wires, on the tramp to control the jib sheet, and a sheet that runs forward to a pig tail with 2 small blocks and a clip.
the clip goes on the back end of the jib and the sheet from the jib blocks runs around the small blocks and then back to the blocks where it gets tied off

a google and youtube search of pics and videos will help to set things up

here's a start

http://www.youtube.com/watch?v=j55lMDEBmP8


eric e
1982 nacra 5.2 - 2158
2009 weta tri - 294