Hi all,
sorry for being quiet for a while, as stuff crawls to a stop around Xmas, but things are picking up now.
The attached pic's are from Billy & Grahame's project in the North of NZ and they are building 4 boats, 2 for each of their kids. Pictures should be pretty self explanatory and are in sequence. The first boat should hit the water in about 6 weeks....we hope ?
For those not familiar with the project, we elected to make foam/e-glass panels that will then be tabbed together in the jig rather than make it from plywood.

Cheers
RG
[Linked Image]

Attached Files
132040-B-01_001.JPG (1185 downloads)