Thanks John for the complement...this build is going to have to go in spurts, as time permits. Tackled the tight chine radius this morning...worked well considering the compound curve the strips were required to make.

[Linked Image]
Worked on the sheer this evening...so all the basic foam for one half of one hull has been glued in place....the epoxy/glass bubbles were too wet on the new work to trim the foam tight to the jig.

[Linked Image]

Uploaded with ImageShack.us




Last edited by Seeker; 10/27/10 09:38 PM.