the new ones.....

In the above pic (first in the last post) you can see I'd already done the front ones.

finished the 2 rear ones last night (sorry about the pic's darkness but it was a late night
wink

[Linked Image]

sewer pipe cut/heated and moulded to the hull shape....
Riveted onto a steel rhs base and with 3mm plate added as support wings.
The front ones are solidly mounted whilst the rears 'hinge' down ~25degrees.

just got to glue on the carpet now.....

I'll add a front rack to pickup the front beam and a hinging rear rack to hold the rear beam.....
these slippers will only be used for loading and unloading the boat.


Yar, & this ere post be done without a sin'le drop o' rum passin' me lips

Kingy
started with Impara Cadet #3 / Mosquito #245
& now Mosquitos #1182 & #1740